Bath
May 12th, 2009
How time flies. Much has happened since the last blog entry,on different levels…the Airstream has seem tremendous progress. Other news and events can be looked up next door in the news blog. We’ll keep this blog for work in progress.
The rear bath is now pretty much finished, aside from caulking the seams and installing a shower hose.
The rear bath is now pretty much finished, aside from caulking the seams and installing a shower hose.
A closet was fitted into the street side corner, next to the toilet. It has a somewhat narrow front, to accommodate the space available, but widens towards the rear to maximize it’s capacity.
The doors were fitted with finger slits that also provide ventilation. We carried this over from the bedroom cabinetry and from the designs in the front room.
The doors were fitted with finger slits that also provide ventilation. We carried this over from the bedroom cabinetry and from the designs in the front room.
A wide angle shot of the left side of the bath. …under construction…
The finished shower stall, sans trim parts
The upper part of the shower stall.
a birds eye view, from late last night…
..and one more of the shower stall.
Today’s Tunes: KROQ FM
Today’s Temps: mid 80’s in the studio, high 80’s outside.