More from the Studio
March 17th, 2009
A quick update on the Ambassador progress…we’ve had a few setbacks with broken tools, a shrinking wood supply, and shipping delays. But, we’re back on track now.
The brake system is now all plumbed in and ready to be filled and bled.
The brake system is now all plumbed in and ready to be filled and bled.
This is the right front brake, the lines are visible right below the wheel housing.
Same wheel, different camera angle.
The television mount is also in place, and properly reinforced from behind the divider wall.
This is with the nit moved forward slightly. It fits this wall just perfect. It’s a 22in HD widescreen with built in DVD player.
..a nice articulating mount..will be locked in place for travel.
This is the panel in it’s flattest position, against the wall.
The refrigerator has seen some action this week. We made front panels to match the interior wood, and fitted the unit in it’s fully insulated compartment.
A nice fit, and a clean look. We might change the panels to a stainless panel, at a alter time, should the client decide to change them.
and from another angle. My apologies for the poorly lit pics in tis update.
Almost time to move into the bedroom area. We’re using a laser to line things up and to make sure everything is level and tight, as much as that is possible in a Vintage Airstream.
Today’s temps: 75F
Today’s tunes: Old School R&B by Commodores, Earth Wind and Fire, and Tower of Power.